PlotciCAll: Plots the CI estimation of 5 continuity corrected methods (Wald, Wald-T, Score, Logit-Wald, ArcSine) given n, alp and c
Description
Plots the CI estimation of 5 continuity corrected methods (Wald, Wald-T, Score, Logit-Wald, ArcSine) given n, alp and c
Usage
PlotciCAll(n, alp, c)
Arguments
n
- Number of trials
alp
- Alpha value (significance level required)
c
- Continuity correction
Details
Plots the Confidence Interval for 5 continuity corrected methods (Wald, Wald-T, Score, Logit-Wald, ArcSine) for n given alp along with Continuity correction c