Arguments
y
a numeric vector or time series
h
Number of periods for forecasting
level
Confidence levels for prediction intervals.
fan
If TRUE, level is set to seq(51,99,by=3). This is suitable for fan plots.
lambda
Box-Cox transformation parameter. Ignored if NULL. Otherwise, forecasts back-transformed via an inverse Box-Cox transformation.
biasadj
Use adjusted back-transformed mean for Box-Cox transformations. If TRUE, point forecasts and fitted values are mean forecast. Otherwise, these points can be considered the median of the forecast densities.
x
Deprecated. Included for backwards compatibility.