Sets the Date limits to the surfaces being estimated from the Sample data set. The start is less
than a year prior to the first date (typically the date of the first sample) and the end is
less than a year after the last date (typically the date of the last sample). The start is
constrained to be on the first day of the period of analysis and the end is constrained to
be on the last day of the the period of analysis
Usage
surfaceStartEnd(paStart, paLong, Date1, Date2)
Arguments
paStart
numeric integer specifying the starting month for the period of analysis, 1<=paStart<=12, default is 10
paLong
numeric integer specifying the length of the period of analysis, in months, 1<=paLong<=12, default is 12