The eight potential times-series are:
NTC direct : the upstream-to-downstream capacity, in MW. Default to 1
.
NTC indirect : the downstream-to-upstream capacity, in MW. Default to 1
.
Hurdle cost direct : an upstream-to-downstream transmission fee, in euro/MWh. Default to 0
.
Hurdle cost indirect : a downstream-to-upstream transmission fee, in euro/MWh. Default to 0
.
Impedances : virtual impedances that are used in economy simulations to give a physical meaning to raw outputs,
when no binding constraints have been defined to enforce Kirchhoff's laws. Default to 0
.
Loop flow : amount of power flowing circularly though the grid when all "nodes" are perfectly balanced (no import and no export). Default to 0
.
PST min : lower bound of phase-shifting that can be reached by a PST installed on the link, if any. Default to 0
.
PST max : upper bound of phase-shifting that can be reached by a PST installed on the link, if any. Default to 0
.
According to Antares version, usage may vary :
< v7.0.0 : 5 first columns are used in the following order: NTC direct, NTC indirect, Impedances, Hurdle cost direct,
Hurdle cost indirect.
>= v7.0.0 : 8 columns in order above are expected.
>= v8.2.0 : there's 2 cases :
8 columns are provided: 2 first are used in tsLink
, other 6 are used for link data
6 columns are provided: you must provide NTC data in tsLink
argument.