Learn R Programming

durmod (version 1.1-4)

Mixed Proportional Hazard Competing Risk Model

Description

Estimation of piecewise constant mixed proportional hazard competing risk model with NPMLE. The model is described in S. Gaure et al. (2007) , J. Heckman and B. Singer (1984) , and B.G. Lindsay (1983) .

Copy Link

Version

Install

install.packages('durmod')

Monthly Downloads

58

Version

1.1-4

License

Artistic-2.0

Issues

Pull Requests

Stars

Forks

Maintainer

Simen Gaure

Last Published

March 30th, 2020

Functions in durmod (1.1-4)

mphdist

Extract the mixed proportional hazard distribution
datagen

Generate example data
a2p

Convert probability parameters to probabilities
flatten

Convert a structured coefficient set to a vector
durdata

Duration data
geninv

Moore-Penrose generalized inverse
mphcrm.callback

Default callback function for mphcrm
mphcrm

Estimate a mixed proportional hazard model
durmod-package

A package for estimating a mixed proportional hazard competing risk model with the NPMLE.
smashlevels

Collapse levels of a factor
timestr

Prettyprint a time interval
pseudoR2

Calculate various pseudo R2's
se

Extract standard errors of the estimated parameters
mphcrm.control

Control parameters for mphcrm