Restarts selected nodes of a previous partially completed workflow run and resumes the workflow run. The selected nodes and all nodes that are downstream from the selected nodes are run.
See https://www.paws-r-sdk.com/docs/glue_resume_workflow_run/ for full documentation.
glue_resume_workflow_run(Name, RunId, NodeIds)
[required] The name of the workflow to resume.
[required] The ID of the workflow run to resume.
[required] A list of the node IDs for the nodes you want to restart. The nodes that are to be restarted must have a run attempt in the original run.