Piston rings for an automotive engine are produced by a forging process. The inside diameter of the rings manufactured by the process is measured on 25 samples, each of size 5, for the control phase I, when preliminary samples from a process being considered 'in control' are used to construct control charts. Then, further 15 samples, again each of size 5, are obtained for phase II.
Usage
data(pistonrings)
Arguments
Format
A data frame with 200 observations on the following 3 variables.
diameter
a numeric vector
sample
sample ID
trial
preliminary sample indicator (TRUE/FALSE)
References
Montgomery, D.C. (1991) Introduction to Statistical Quality Control, 2nd ed, New York, John Wiley & Sons, pp. 206--213